Skip to content
Helicopter UAV passing over a hangar roof, flags of several nations below

Solution

Survey & Mapping

Orthomosaics, digital elevation models, contours and volumetrics for terrain, mining and construction.

The problem

Ground survey is slow, and satellite imagery is too coarse.

Earthworks, mining, estate and infrastructure projects need centimetre-level terrain data on a schedule that a survey crew on foot cannot keep, over ground that is often unsafe to walk.

Our approach

Flight-planned photogrammetry with ground control.

  1. 01

    Mission planning

    Ground sample distance, overlap and flight lines set from the deliverable; permissions obtained before the sortie.

  2. 02

    Ground control

    GCPs established and surveyed so outputs are georeferenced to the project datum.

  3. 03

    Acquisition

    Autonomous waypoint flights with the helicopter for area and endurance, the multirotor for corridors and steep ground.

  4. 04

    Processing

    Orthomosaic, DSM/DTM and contour generation with quality checks against control.

Deliverables

What you receive.

  • Orthomosaic maps

    Georeferenced, seamless imagery of the site.

  • Digital elevation models

    DEM, DSM and DTM for elevation analysis.

  • Contours and terrain models

    Customisable contour intervals and 3D terrain visualisations.

  • Volumetrics

    Stockpile volumes, cut-and-fill analysis and earthwork cost-estimation inputs.

  • Slope analysis

    Slope maps for drainage, access and stability planning.

Platforms and questions

Which aircraft, and what people ask.

What accuracy can we expect?
Accuracy depends on ground sample distance and ground control. Figures are quoted per project after the site and deliverables are defined.
How large an area per day?
Helicopter sorties cover the largest areas; multirotor flights suit corridors and steep terrain. Daily coverage is estimated in the proposal.

Enquiry

Scope a survey & mapping project.

Tell us the site, the deliverables and the timeline, and we come back with an approach and a quotation.